150329 UR5 Production Run

MM Today 150322

UR5 Robot Verification Run

UR5 Robot Program Verification

MM Today 150320

MM Today 150319

MM Today 150318

MM Today 150317

Pre-Open Push – GO Team!

Please help us with the final push to get open.


Here’s the signup form.

Proposed Floor Plan

Pat delivered the proposed floor plan for the facility. Its awesome! Click on the thumbnails below for a closer look.

MM Floor Plan Lower Level
Lower Level

MM Floor Plan Upper Level
Upper Level