150329 UR5 Production Run

MM Today 150322

UR5 Robot Verification Run

UR5 Robot Program Verification

MM Today 150320

MM Today 150319

MM Today 150318

MM Today 150317

Pre-Open Push – GO Team!

Please help us with the final push to get open.

t_141028-104841

Here’s the signup form.

Proposed Floor Plan

Pat delivered the proposed floor plan for the facility. Its awesome! Click on the thumbnails below for a closer look.

MM Floor Plan Lower Level
Lower Level

MM Floor Plan Upper Level
Upper Level